Project

General

Profile

Actions

Task #47

closed

Redesign the website download links and pages

Added by Jean-Michel Philippe about 13 years ago. Updated over 12 years ago.

Status:
Closed
Priority:
Urgent
Category:
Designing
Start date:
09/01/2011
Due date:
09/24/2011
% Done:

100%

Estimated time:
3:00 h
Spent time:

Description

As indicated in a thread of our mailing list, we'd like to simplify the download process so that people do not ask themselves too many questions before clicking on their CD link (see https://mail.gna.org/public/doudoulinux-dev/2011-03/msg00053.html).

We propose to implement a single download link that just starts the download for the ISO file of the page language. We'll have 2 links instead of a single one:

  • “Download now (English)” ? the CD file
  • “Other media or languages” ? the download page with full tables but with the USB image file of the page language alone on top of the page

To achieve this we need to:

  1. write Php code that generates the CD or USB download link for the page language
  2. change Spip skeletons to call the Php code
  3. reorganize the download page
  4. eventually redesign the download boxes

Sub-tasks are required!


Related issues 1 (0 open1 closed)

Related to Documentation - Task #388: Udpate website for Gondwana update 1Closed09/16/201109/26/2011

Actions
Actions #1

Updated by Jean-Michel Philippe almost 13 years ago

  • Project changed from Documentation to Website design
Actions #2

Updated by Jean-Michel Philippe almost 13 years ago

  • Due date changed from 05/23/2011 to 08/22/2011
  • Category set to Designing
  • Target version changed from 2011-05 (Gondwana) to 2011-08
  • Start date changed from 04/21/2011 to 06/06/2011
Actions #3

Updated by Jean-Michel Philippe over 12 years ago

  • Due date changed from 08/22/2011 to 11/21/2011
  • Assignee set to Elisa de Castro Guerra
  • Target version changed from 2011-08 to 2011-11
  • Start date changed from 06/06/2011 to 09/01/2011
Actions #4

Updated by Jean-Michel Philippe over 12 years ago

  • Due date changed from 11/21/2011 to 09/15/2011
  • Priority changed from Normal to Urgent
  • Target version changed from 2011-11 to Gondwana update 1
Actions #5

Updated by Jean-Michel Philippe over 12 years ago

Still nobody to start this job? :(

Actions #6

Updated by Jean-Michel Philippe over 12 years ago

  • Due date changed from 09/15/2011 to 09/24/2011
  • % Done changed from 0 to 50
  • Estimated time set to 8:00 h

I've just written the Php code needed to rewrite download links. We need to decorate the download box then update/create download pages on Spip.

Actions #7

Updated by Jean-Michel Philippe over 12 years ago

  • Assignee changed from Elisa de Castro Guerra to Jean-Michel Philippe
  • % Done changed from 50 to 100
  • Estimated time changed from 8:00 h to 3:00 h

Download links are now changed, we still need improved styling though :).

Actions #8

Updated by Jean-Michel Philippe over 12 years ago

  • Status changed from New to Closed
Actions

Also available in: Atom PDF